The Commission has opened a call for applications for energy infrastructure projects under the Trans-European Network for Energy (TEN-E) Regulation to obtain Project of Common Interest (PCI) or Project of Mutual Interest (PMI) status.
The call for the electricity, hydrogen & electrolyser categories runs from 18 September to 18 November 2024, and for the smart electricity grids, smart gas grids, CO2 and the projects falling under the Article 24 derogation, from 18 September to 18 December 2024.
To be eligible for inclusion in the Union list of PCIs and PMIs, projects in electricity and hydrogen must be included in the 2024 Ten-Year Network Development Plans (TYNDP) developed by the European Network of Transmission System Operators for Electricity (ENTSO-E) or Gas (ENTSOG).
Promoters of projects interested in becoming PCIs or PMIs are invited to submit an application via the online platforms
Eligible projects will be assessed against the criteria set out in the TEN-E Regulation to identify their contribution to the implementation of the respective energy infrastructure priority corridor.
Projects meeting all requirements of the regulation will be assessed and ranked by the TEN-E Regional Groups and may then be proposed for inclusion in the 2nd Union list of PCIs and PMIs.
The delegated act containing the Union list will be adopted by the Commission by the end of 2025 and enter into force in early 2026 if no objection is expressed by the European Parliament or Council.
Below is an overview of the main steps of the 2nd PCI/PMI process.
PCI/PMI process – electricity
PCI/PMI process – hydrogen
PCI/PMI process – smart electricity/gas grids and CO2 categories
For questions concerning the electricity and hydrogen application modules and TYNDPs
For questions concerning the submission process for smart electricity grids, smart gas grids, CO2 transport and storage and article 24 related projects: ENER-C4-PROJECTSec [dot] europa [dot] eu (ENER-C4-PROJECTS[at]ec[dot]europa[dot]eu)
For questions concerning the overall PCI/PMIs identification and selection process: ENER-C4-PROJECTSec [dot] europa [dot] eu (ENER-C4-PROJECTS[at]ec[dot]europa[dot]eu)
Zelenskyy insisted that any steps to secure peace in Ukraine would have to involve the might of the United States.Ukrainian President Volodymyr Zelenskyy has ur
Dirty secret That’s where Germany comes in. The dirty little secret of European R&D spending is that half of it comes from Germany. And most of that in
Dutch company Penta Infra has managed to snare pension fund PGGM as a new shareholder. With a 49 percent percentage, PGGM has become the s
WASHINGTON — The European Commission and European Space Agency signed contracts with an industrial consortium Dec. 16 to develop a secure connectivity